Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

Society for Mining, Metallurgy & Exploration
Irwan Halim Seung Han Kim
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
4946 KB
Publication Date:
Dec 1, 2022

Abstract

This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be constructed in complex sedimentary rocks. Special features of the segments include a large keystone and no connector used on radial joints. The typical segments will be steel fiber reinforced, and hybrid segments with additional steel rebars and shear bicones will be used around the adit openings without use of any structural framing. The important design considerations will be discussed, including special 3D segment to adit connection analyses performed.
Citation

APA: Irwan Halim Seung Han Kim  (2022)  Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

MLA: Irwan Halim Seung Han Kim Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account