Abstract

The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for erecting these structures. The leveling of the foundation is done by rock excavation, when the establishments have to be setup in hilly/rocky areas. Drilling and blasting is the cheapest and most dominant method of rock excavation. However, this method has associated hazards in terms of blast induced ground vibration, air overpressure, flyrocks etc. The foundation work and erection of the industrial buildings are done in parallel to achieve the faster construction of the establishment. The challenges to reduce the induced hazards in such cases are more. This paper presents a case study on the controlled blasting method devised for the rock excavation for construction of 2 × 660 MW Obra-C thermal power plant. The foundation work for this power plant was made by excavation of Dolomitic rock. The excavation work was performed in the proximity of the existing residence of the local people and Obra market. With the advancement of project, the excavation was also performed in the proximity to the ongoing construction work of various industrial buildings. Accordingly, the controlled blasting pattern was devised suitable to the specific sites. The pattern consisted of variations in blasthole diameter, burden-spacing, maximum explosive charge per delay, total explosive in a blasting round, initiation system and direction of initiation. The suitable muffling arrangements were also used, when the blast was conducted in the close proximity to the structures. The initial blasting pattern was established by analysis of blast vibration wave propagation characteristics. Thereafter, the final pattern was adopted for the safe excavation at the site. The safe excavation for the foundation work of this power plant has been completed successfully based on the devised controlled blasting pattern.
Citation

APA: Vivek K. Himanshu A K. Vishwakarma Shubham Singh Dipankar Gorain R S. Yadav Murari P. Roy  (2023)  Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

MLA: Vivek K. Himanshu A K. Vishwakarma Shubham Singh Dipankar Gorain R S. Yadav Murari P. Roy Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment. International Society of Explosives Engineers, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account