Development of Drilling and Blasting Practices at The Vickery Coal Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 437 KB
- Publication Date:
- Jan 1, 1992
Abstract
The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation adopted from the feasibility studies requires that throw blasting of the overburden be used to assist dragline productivity.This paper reviews the development of the drilling and blasting practices with particular emphasis on the throw blasting of the overburden and optimisation of costs. This review includes analysis of the pre-production drilling and blasting feasibility studies by comparison with actual results.
Citation
APA:
(1992) Development of Drilling and Blasting Practices at The Vickery Coal MineMLA: Development of Drilling and Blasting Practices at The Vickery Coal Mine. The Australasian Institute of Mining and Metallurgy, 1992.