Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHAS

The Australasian Institute of Mining and Metallurgy
Burgess G. C Thompson D
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
424 KB
Publication Date:
Jan 1, 1992

Abstract

Subsequent to large scale trials in 1987, the installation of a submerged lance Sirosmelt furnace system was approved in late-1988 for the cupellation of retort bullion to dore silver. Commissioning work commenced in June 1990. During the process air is lanced into a molten slag bath contained in a cylindrical vessel to rapidly oxidise the granulated feed bullion from 15 - 25 per cent silver to rough dore grade. The process is now an integral part of the Precious Metals operation replacing the first stage reverberatory cupellation furnaces to achieve productivity improvements, lower silver inventory and increased silver Recovery.
Citation

APA: Burgess G. C Thompson D  (1992)  Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHAS

MLA: Burgess G. C Thompson D Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHAS. The Australasian Institute of Mining and Metallurgy, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account