Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway

Society for Mining, Metallurgy & Exploration
Chris Bennett Drupad Desai Kirit Mevawala
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
1317 KB
Publication Date:
Jan 1, 2005

Abstract

INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underground facilities, there were no examples to be followed in early 90sin the continental United States or its territories. When DMJM+HARRIS was selected as general architectural and engineering consultant for the Tren Urbano (TU) project in Puerto Rico, one of the requirements of the Federal Transit Administration (FTA) for funding commitment was to use TU as a demonstration project utilizing design/build contract delivery method. Now fifteen years later, New York City Transit (NYCT) has instituted a similar requirement for their first Tunnel Boring Machine (TBM) contract for the Second Avenue Subway. As with most construction mega-projects, lots of things have happened and there were several lessons learned from the TU experience that are now being applied to Second Avenue. Both of these projects require building tunnels and underground transit facilities in heavily traveled corridors of an urban city, in the vicinity of active business and commercial enterprises. To enhance the challenge, there are noise and vibration sensitive and historic urban receptors either over or along both the transit corridors. Column free Tren Urbano station caverns over18 m (60 ft.) wide were built in soft ground conditions within 3.6 m (12 ft.) of the surface under an aging heavy utility corridor, while NYCT tunnels with station structures stretching the limits of rock caverns to 34.8 m (100 ft.), were planned in rocky geology with the presence of shear and fault zones and some mixed face conditions. BACKGROUND During the early period of design/build experimentation, the speed with which the contract procurement packages could be put together enabled the owners to take advantage of the major efforts underway to rebuild the infrastructure that was suffering from post-World War II neglect. Use of design/build for new starts was unheard of and most of the projects were smaller in nature in order to allow the methodology to be tested. Development of functional design packages with the understanding that the D/B
Citation

APA: Chris Bennett Drupad Desai Kirit Mevawala  (2005)  Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway

MLA: Chris Bennett Drupad Desai Kirit Mevawala Development of the Design Build Philosophy—Tren Urbano to Second Avenue Subway. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account