Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section

Society for Mining, Metallurgy & Exploration
D. J. Gilbert
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
4
File Size:
918 KB
Publication Date:
Jan 1, 2011

Abstract

As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water collecting from an old lakebed. Subsequently, 20 steel arches were installed to provide additional support in an area of tunnel where original geological mapping indicated Type IV rock. This project was completed ontime with no loss to production. Construction schedules had to be developed to half hour precision, to accommodate the installation.
Citation

APA: D. J. Gilbert  (2011)  Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section

MLA: D. J. Gilbert Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section. Society for Mining, Metallurgy & Exploration, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account