Differential Flotation Commissioning at Telfer

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 571 KB
- Publication Date:
- Jan 1, 2007
Abstract
The redevelopment of the Telfer Gold Mine in the Pilbara region of Western Australia was primarily based on the construction of a 17 Mtpa dual train concentrator coupled with open pit and underground mining operations. The unique copper-gold orebody at Telfer requires the application of complex flotation conditions normally reserved for base metal concentrators, where two competing minerals are managed into separate products. This paper describes the commissioning of the flotation circuit, the process modes and the master/slave relationship that flotation has with a variable orebody.
Citation
APA:
(2007) Differential Flotation Commissioning at TelferMLA: Differential Flotation Commissioning at Telfer. The Australasian Institute of Mining and Metallurgy, 2007.