Digital Work Preparation Tool for Underground Construction Tasks—Planning and Optimizing Projects - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 194 KB
- Publication Date:
- Jun 13, 2023
Abstract
The demand for sustainable and profitable/efficient projects within the tunneling
and other underground engineering sectors grows rapidly. Construction tasks play
a key role within the project conduction, whether as primary (tunneling), secondary
(e.g., mine securing) or tertiary processes (e.g., workshops). The construction tasks
of primary processes create the main structures, such as tunnels, which resemble
the main project goal. For the secondary and tertiary processes, the purpose of the
task shifts. The main goal is to provide structures, such as the securing of the cavity
and workshops, that enable the project and enhance the efficiency of the primary
conduction underground.
To plan and optimize the conduction of construction tasks underground, whether they
are identified as primary, secondary or tertiary tasks, the work preparation can be
used. This method, known from the above ground construction, can be adapted and
used underground. The approach of a digital work preparation tool combines, connects
and adapts the main tasks “choice of procedure,” “logistics” and “site planning.” In
addition, the digital tool is connected with digital models (construction, site, surroundings).
With the adaption and forward projection of the work preparation, underground
constructions (e.g., tunneling) can provide a more sustainable and efficient outcome.
Citation
APA:
(2023) Digital Work Preparation Tool for Underground Construction Tasks—Planning and Optimizing Projects - RETC2023MLA: Digital Work Preparation Tool for Underground Construction Tasks—Planning and Optimizing Projects - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.