Discussion On Base Grouted Piles

- Organization:
- Deep Foundations Institute
- Pages:
- 2
- File Size:
- 180 KB
- Publication Date:
- Jan 1, 1991
Abstract
Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three preliminary test piles and two working test piles. The results of these tests are summarised in Table 1 below. Two of the preliminary test piles were located only 14m apart to compare the performance of a base grouted and ungrouted pile in similar ground conditions. The load/settlement behaviour of these two preliminary test piles are compared on Figure 1. All the piles were drilled under bentonite with a drilling bucket. In the base grouted piles four grouting tubes were placed with the reinforcement cage to within 500mm of the pile toe. After the pile had been concreted these grouting tubes were then extended to the pile base by drilling and packers were installed. Grout was then injected into the four tubes simultaneously.
Citation
APA:
(1991) Discussion On Base Grouted PilesMLA: Discussion On Base Grouted Piles. Deep Foundations Institute, 1991.