Drainage Research at Mount Isa Mines Limited 1992 - 1997

The Australasian Institute of Mining and Metallurgy
J Chen
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
1462 KB
Publication Date:
Jan 1, 1998

Abstract

Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled stopes has been the primary cause of bulkhead failures and emphasis is placed on research into the piping mechanism. Laboratory and in situ tests aimed at understanding the piping mechanism have been conducted and the results are presented. A case history of piping in a draining bench stope fill mass is described and a technique for reducing the potential for bulkhead failures in bench stopes is presented. Hydraulic fill is produced by standard cycloning of tailings and the overflow (reject material) is sent to thickeners prior to placement in the tailings dams. Research into the partial introduction of thickener underflow into the backfill system and its influence on backfill drainage is also described.
Citation

APA: J Chen  (1998)  Drainage Research at Mount Isa Mines Limited 1992 - 1997

MLA: J Chen Drainage Research at Mount Isa Mines Limited 1992 - 1997. The Australasian Institute of Mining and Metallurgy, 1998.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account