Drilling and Blasting on the Ty Nant Project.

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 2039 KB
- Publication Date:
- Jan 1, 2011
Abstract
The A5 road in the United Kingdom forms an ancient and well-used route through the hills and mountains of North Wales. In the 1990?s a programme of work was conducted to upgrade the road to modern standards. As part of this work a new cutting was constructed to bypass a portion of road routed through a gorge close to the village of Ty Nant. This new cutting was formed by drilling and blasting and included much pre-splitting and extensive rock bolting. This operation caused much concern to local residents relating to vibration, air overpressure and flyrock.