DWS Design & Construction Monitoring of a Road Tunnel Under Very Low Cover in the SNCF South-East European Technicentre in Paris - NAT2024

Society for Mining, Metallurgy & Exploration
Bénédicte Robert Edoardo Trivellato Yassine Lahmadi Christian Chereau
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
747 KB
Publication Date:
Jun 23, 2024

Abstract

Within the framework of the adaptation of the South-East European Technicentre (Technicentre Sud-Est Européen TSEE), SNCF Voyageurs appointed Pini with the project management mission (MOE) for the design and construction monitoring of a road tunnel. This investment has a dual function: during the site transformation phase, it facilitates the work logistics (and shorten traffic flows); and in the operating phase, it is intended to ease all movements on the site over the long term. This is a limited-length gallery (50 meters) to be performed in conventional excavation below Poniatowski Avenue (Paris 12e). The excavation, crossing the entire width of the boulevard, constitutes a major challenge, given the very low coverage (less than 5.5 m), and the surrounding main infrastructures. The same project mis- sion includes the design of the tunnel accesses, via reinforced-concrete frame structures. The targeted design questions several aspects of its execution framework, and particularly, continuous operation must be guaranteed to the neighboring networks during the works. The installation of an umbrella- pipe all along the excavation profile, the progression in divided sub-sections, and the implementation of a complex monitoring system are hence key elements for limiting and controlling any deformation. An exhaustive 3D finite element modelling was performed, taking into account the detailed phasing of construction (pre-support, excavation in divided section, preliminary support and definitive lining), to dimen- sion the structures, and, overall, to analyze the impacts on the neighboring structures and facilities. During the execution phase (planned for mid-2024), monitoring activities with back-analyses as close as possible to the works are planned.
Citation

APA: Bénédicte Robert Edoardo Trivellato Yassine Lahmadi Christian Chereau  (2024)  DWS Design & Construction Monitoring of a Road Tunnel Under Very Low Cover in the SNCF South-East European Technicentre in Paris - NAT2024

MLA: Bénédicte Robert Edoardo Trivellato Yassine Lahmadi Christian Chereau DWS Design & Construction Monitoring of a Road Tunnel Under Very Low Cover in the SNCF South-East European Technicentre in Paris - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account