Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

International Society of Explosives Engineers
Jorge Cárdenas Gustavo Huerta Regina Rocha Oriundo Miguel Angel Humpire Johan Salas Flores
Organization:
International Society of Explosives Engineers
Pages:
10
File Size:
1434 KB
Publication Date:
Feb 6, 2023

Abstract

Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in diameter cartridges initiated by detonating cord. Traditional loading process requires a significant amount of trained personnel, which in our application context could take up to 20 blasters. When pre-split blast is scheduled, it usually reduces the availability of the blasters on the total loading services at site which are also demanded to have production blasting ready at same 12-hour shift daylight time.
Citation

APA: Jorge Cárdenas Gustavo Huerta Regina Rocha Oriundo Miguel Angel Humpire Johan Salas Flores  (2023)  Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

MLA: Jorge Cárdenas Gustavo Huerta Regina Rocha Oriundo Miguel Angel Humpire Johan Salas Flores Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System. International Society of Explosives Engineers, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account