Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 1434 KB
- Publication Date:
- Feb 6, 2023
Abstract
Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in diameter cartridges initiated by detonating cord. Traditional loading process requires a significant amount of trained personnel, which in our application context could take up to 20 blasters. When pre-split blast is scheduled, it usually reduces the availability of the blasters on the total loading services at site which are also demanded to have production blasting ready at same 12-hour shift daylight time.
Citation
APA:
(2023) Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading SystemMLA: Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System. International Society of Explosives Engineers, 2023.