Environmental Considerations and the Modern Electrolytic Zinc Refinery

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 3
- File Size:
- 250 KB
- Publication Date:
- Jan 11, 1977
Abstract
Constraints in the location, process selection, and operation of the modern zinc refinery brought about by the heightened environmental awareness of the public were explained by Sanjoy Shome, project engineer for Kaiser Engineers Inc.
Citation
APA: (1977) Environmental Considerations and the Modern Electrolytic Zinc Refinery
MLA: Environmental Considerations and the Modern Electrolytic Zinc Refinery. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1977.