Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

The Australasian Institute of Mining and Metallurgy
H Vega S Riza P Gonzalez-Carbonell P Wahyono P Vergara
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
612 KB
Publication Date:
Jul 1, 2013

Abstract

PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will be located underneath the current Grasberg Open Pit. Initial studies of the potential to develop a block cave mine in the Grasberg orebody have revealed that the mine will require significant volumes of air. The Grasberg Block Cave (GBC) project requires four primary fans (3750 kW each) to support production at full capacity.Fan #1 commissioning was accomplished successfully on 9 February 2012. However, Fan #2 chamber, which is separated by a 20 m pillar, had not been completed. The main challenge was Fan #2 chamber still needed to be benched. The risk of damage to the critical infrastructure in Fan #1 chamber, including ground support, cracks in pedestals, and misalignment in the impeller shaft were considered. The challenges were blasting the bench without damaging the surrounding infrastructure, completing the work safely and meeting the schedule. This was achieved with the engineering control methodology. This paper summarises the benching process of Fan #2 chamber and its impact upon Fan #1.CITATION:Vega, H, Riza, S, Gonzalez-Carbonell, P, Wahyono, P and Vergara, P, 2013. Excavating an underground primary fan chamber that is adjacent to a fully operational primary fan in PT Freeport Indonesia's Grasberg Block Cave Mine, in Proceedings The Australian Mine Ventilation Conference , pp 115-122 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: H Vega S Riza P Gonzalez-Carbonell P Wahyono P Vergara  (2013)  Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

MLA: H Vega S Riza P Gonzalez-Carbonell P Wahyono P Vergara Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine. The Australasian Institute of Mining and Metallurgy, 2013.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account