Excavation and Support of Cross Passages on Westside I - RETC2023

Society for Mining, Metallurgy & Exploration
Jeff Brandt Kerwin Hirro Peter Dietrich Norbert Fuegenschuh Mike Cole Joseph DeMello
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
192 KB
Publication Date:
Jun 13, 2023

Abstract

This paper presents a successful case history of the ground improvement efforts and excavation of twenty-three cross passages between twin bore tunnels driven by EPB tunneling machines in Los Angeles, California on Section 1 of the Westside Subway Extension. Unique and complicated ground conditions local to the tunnel alignment include San Pedro sands, siltstone/claystone Fernando Formation, and zones of “asphalt impacted soils.” To provide water cut-off and soil stabilization, jet grouting was performed prior to TBM excavation at the location of many of the cross passages. However, upon investigating the cross passages prior to excavation, the subsurface conditions required additional measures and SEM tools to ensure successful completion of the project.
Citation

APA: Jeff Brandt Kerwin Hirro Peter Dietrich Norbert Fuegenschuh Mike Cole Joseph DeMello  (2023)  Excavation and Support of Cross Passages on Westside I - RETC2023

MLA: Jeff Brandt Kerwin Hirro Peter Dietrich Norbert Fuegenschuh Mike Cole Joseph DeMello Excavation and Support of Cross Passages on Westside I - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account