Excavation Through Highly Fractured And Sheared Host Rock - Pacheco Pumping Plant

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 8
- File Size:
- 237 KB
- Publication Date:
- Jan 1, 1984
Abstract
A properly designed pre- and post-grouting program aided with coherent construction sequence and adoption of flexible design approach provide a practical combination to solve excavation problems in a hostile rock environment: intensely fractured and sheared. The Pacheco Pumping Plant demonstrates the utility of an engineered grouting program.
Citation
APA:
(1984) Excavation Through Highly Fractured And Sheared Host Rock - Pacheco Pumping PlantMLA: Excavation Through Highly Fractured And Sheared Host Rock - Pacheco Pumping Plant. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1984.