Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
698 KB
Publication Date:
Jan 1, 1989

Abstract

The process selection and design aspects to treat primary ore in a new carbon-in-pulp (C.I.P.) plant while utilizing, where possible, existing equipment and infra- structure are discussed. The existing crushing plant, water supply, reagents, laboratory and infrastructure facilities from the heap leach have been upgraded and expanded to meet the C.I.P. plant requirements. The new power supply is from the North Queensland grid system. A series of metallurgical tests was carried out and a review of the data showed that the primary ore was amenable to conventional cyanide leaching. Following feasibility studies, a new process plant which included grinding mills, leaching, and adsorption tanks, thickener, desorption and gold roam facilities was constructed.
Citation

APA:  (1989)  Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore

MLA: Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore. The Australasian Institute of Mining and Metallurgy, 1989.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account