Expert Control at Boddington Gold Mine
 
    
    - Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 315 KB
- Publication Date:
- Jan 1, 1997
Abstract
In November 1996, Boddington Gold Mine (BGM) began the  implementation of an expert system. The objective of the expert system  was to improve plant efficiency by developing an `operator best practice'  control philosophy for the grinding circuit
Citation
APA: (1997) Expert Control at Boddington Gold Mine
MLA: Expert Control at Boddington Gold Mine. The Australasian Institute of Mining and Metallurgy, 1997.
