Explosive Operations for Constructing a Tunnel Based PCB Collection System

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 302 KB
- Publication Date:
- Jan 1, 2010
Abstract
In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installation of inclined and vertical wells into the zones of contamination to recover PCB’s by gravity. A joint venture of Merco Inc., of Lebanon, NJ, and Obayashi Corporation, of San Francisco, CA, was awarded the contract for constructing the first Tunnel Drain Collection System in the world. Conventional drill and blast techniques were the most economical method to construct the project but due to the presence of PCB’s and community concerns, innovative drill and blast practices were needed.
Citation
APA:
(2010) Explosive Operations for Constructing a Tunnel Based PCB Collection SystemMLA: Explosive Operations for Constructing a Tunnel Based PCB Collection System. International Society of Explosives Engineers, 2010.