Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 m

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 4
- File Size:
- 505 KB
- Publication Date:
- Jan 1, 2009
Abstract
The existing main mine ventilation system for the production areas to the Kiruna mine was constructed during the period 1994-1996 and extended with 4 more shafts, including fan stations, for the sea ore body from 1997-1998. Two papers have been presented from this project at the 7th US Mine Ventilation Symposium in 1995 and at The 6th International Mine Ventilation Congress in 1997. In 2005, pre-studies for a new main haulage level were started. Different haulage methods were presented including ventilation systems. The pre-studies showed that the existing ventilation system, including fan stations for the new main haulage system in the production area, could be extended. However, a new system for the central area, which was not in the initial investment program, would be needed. In the beginning of 2006, a decision was made to design a new ventilation system for the central area to make it possible to get air to the development work for the new main haulage system, independent of the haulage method. This system was operational by the beginning of 2007. The new main haulage system, which was decided to be located on level 1365 m, only requires that the existing shafts be extended - the capacity of the fans seems to be enough. However, the problem is that the existing level 1045 m and the new level 1365 m have to be in operation in parallel for approximately 7-8 years. The challenge for the moment is determining how to ventilate the production areas for both levels at the same time, while simultaneously constructing the extended system. This paper will describe the problems associated with the extension of the main ventilation system and some potential solutions for these problems. The new main haulage level 1365 m must be in operation by 2012.
Citation
APA:
(2009) Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 mMLA: Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 m. Society for Mining, Metallurgy & Exploration, 2009.