Abstract

The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the post tensioning could be carried out successfully in the tunnel, even concurrently with the TBM excavation. This also required the development of new processes both in the casting facility and in the TBM to ensure that the almost 3,700 rings could be successfully manufactured, threaded, stressed, and grouted. This paper will discuss the material selection, fabrication, and installation of, as well as lessons learned from, this first in country tunnel lining.
Citation

APA: Madeline Mello Bryce Scofield Nick Karlin Michael Low  (2024)  Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024

MLA: Madeline Mello Bryce Scofield Nick Karlin Michael Low Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.