Factors Influencing Unplanned Ore Dilution In Narrow Vein Longitudinal Mining

Society for Mining, Metallurgy & Exploration
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
7
File Size:
733 KB
Publication Date:
Jan 1, 2010

Abstract

Unplanned ore dilution can have severe impact on the economics of a mining operation. The paper discusses and distinguishes between controllable and natural parameters influencing ore dilution, and how it can be minimized in longitudinal mining systems of narrow vein orebodies. It is shown through data of surveyed stope profiles and numerical modelling that unplanned ore dilution is a function of stope design and construction, orebody geometry, and rock mass characteristics.
Citation

APA:  (2010)  Factors Influencing Unplanned Ore Dilution In Narrow Vein Longitudinal Mining

MLA: Factors Influencing Unplanned Ore Dilution In Narrow Vein Longitudinal Mining. Society for Mining, Metallurgy & Exploration, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account