Floor Bolting For Control Of Mine Floor Heave

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 4
- File Size:
- 340 KB
- Publication Date:
- Jan 1, 1995
Abstract
Many coal seams are associated with soft floor strata. During mine development, if coal pillars are not properly designed, floor heave occurs and causes interruption of coal production. In the severe cases, the section or mine is abandoned. One method for controlling floor heave is floor bolting. This paper describes the demonstration of flour bolting methods in a West Virginia, info coal mine. Three methods were used: vertical full resin bolting, floor truss bolting and floor truss bolting pins a floor slot at the center of the entry. The design of each method and the experimental results are discussed.
Citation
APA:
(1995) Floor Bolting For Control Of Mine Floor HeaveMLA: Floor Bolting For Control Of Mine Floor Heave. Society for Mining, Metallurgy & Exploration, 1995.