Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal

The Australasian Institute of Mining and Metallurgy
M Byrne M Lindqvist P Newman
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
1931 KB
Publication Date:
Jan 1, 1998

Abstract

SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and possibly replace hydraulic sandfill in the drift and fill stopes. A 250 m flow loop was constructed at the mine and the flow properties of various paste blends were investigated. Cycloned tailings and total tailings were both pumped successfully as pastes and were also combined with waste rock for additional testing. The pressure losses in 102 mm and 154 mm diameter pipeline were recorded at flowrates up to 60 m3/hr and are presented at slumps from 120 mm to 250 mm. The data showed the sensitivity of paste mixtures to slight changes in consistency, confirming the need for accurate control during paste production and distribution. The flow results clearly showed the different paste behaviour between cycloned and total tailings pastes and the change in properties at low and high slumps. In addition to pressure loss data, strength testing was done on 38 mm and 82 mm diameter samples. Further strength testing is ongoing at the mine using fly ash as a supplement to cement, reducing the overall binder cost. Preliminary engineering for the underground distribution system is briefly discussed, with reference to the siting of the plant. The Neves Corvo Mine is particularly shallow and alternative methods to pumping were sought in order to ensure sufficient hydraulic head for underground distribution. The comparison of options had to take into account the capital and operating costs, the operation of the plant and the impact on the future expansion of paste fill utilisation at Neves Corvo.
Citation

APA: M Byrne M Lindqvist P Newman  (1998)  Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal

MLA: M Byrne M Lindqvist P Newman Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal. The Australasian Institute of Mining and Metallurgy, 1998.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account