Fluid Bed Roasting at Mount ISA

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 470 KB
- Publication Date:
- Jan 1, 1974
Abstract
A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 155 000 tonnes blister copper per annum. The paper describes factors influencing the choice of the unit, problems encountered during the commissioning and details of the present roaster operation.
Citation
APA:
(1974) Fluid Bed Roasting at Mount ISAMLA: Fluid Bed Roasting at Mount ISA. The Australasian Institute of Mining and Metallurgy, 1974.