Formwork Solutions for the Final Lining of the Kramertunnel, Germany - RETC2023

Society for Mining, Metallurgy & Exploration
Rainer Antretter
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
14
File Size:
259 KB
Publication Date:
Jun 13, 2023

Abstract

The city of Garmisch-Partenkirchen in southern Germany is located at a main transit road to Tyrol in Austria and suffers of a very heavy traffic load. Therefore, the Kramertunnel as a by-pass tunnel is built to release/mitigate the traffic through the city centre. The 3,600 m long single tube road tunnel is designed with a parallel but smaller emergency tunnel and with cross passages, fitted with single- and doublesided emergency bays, a vent shaft, and an intermediate ceiling to separate fresh air supply from the road traffic. The tunnel, concrete lined along its entire length provided the challenge to find smart formwork solutions for quick set-up, repositioning, setup and pouring. Three particularly specific sections are discussed in this paper.
Citation

APA: Rainer Antretter  (2023)  Formwork Solutions for the Final Lining of the Kramertunnel, Germany - RETC2023

MLA: Rainer Antretter Formwork Solutions for the Final Lining of the Kramertunnel, Germany - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account