Future Prime Movers For Heavy Mining Equipment

The American Institute of Mining, Metallurgical, and Petroleum Engineers
William D. Schwab
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
300 KB
Publication Date:
Jan 1, 1971

Abstract

In the technical literature of 1965 and 1966, there were several papers about future power for mining and construction equipment. Most of these papers made the same predictions: •More power •Better reliability and durability •Ease of service and maintenance •Operating economy •The possibility of future environmental concern •The entrance of the gas turbine In the five years that have since passed, some of the 1965-66 predictions have at least partially come true, while others have not been fully realized. Actually the list still appears sound today. Priorities may have changed and details may be different, but the main points cover the requirements for future prime movers quite well.
Citation

APA: William D. Schwab  (1971)  Future Prime Movers For Heavy Mining Equipment

MLA: William D. Schwab Future Prime Movers For Heavy Mining Equipment. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1971.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account