Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 1554 KB
- Publication Date:
- Jun 13, 2021
Abstract
In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for future population growth within the Lavon Lake watershed. To provide a discharge location for SGRWRRF approximately 4.5 miles of 2.4- meter (96-inch) internal diameter pipeline will be constructed, including 2.3-kilometer (7,800) feet and 487-meter (1,600 foot) long tunnel segments. This paper will discuss the anticipated geology of the two tunnel segments, selection of the tunnel alignment, the anticipated initial tunnel support requirements and other aspects of the project design
Citation
APA:
(2021) Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021MLA: Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021. Society for Mining, Metallurgy & Exploration, 2021.