Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

- Organization:
- International Society of Explosives Engineers
- Pages:
- 14
- File Size:
- 714 KB
- Publication Date:
- Jan 1, 2011
Abstract
In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot (122 meters), vertical to sub vertical scarp feature and shut down production in the lower benches of the pit.