Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

International Society of Explosives Engineers
Tyler Acorn
Organization:
International Society of Explosives Engineers
Pages:
14
File Size:
714 KB
Publication Date:
Jan 1, 2011

Abstract

In December of 2009 an estimated one million ton slope failure activated a 10 million ton mass impacting use of the main ramp system in the Newmont Gold Quarry pit. The failure left behind a 400 foot (122 meters), vertical to sub vertical scarp feature and shut down production in the lower benches of the pit.
Citation

APA: Tyler Acorn  (2011)  Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting

MLA: Tyler Acorn Geotechnical Slope Remediation Via RC-drilling And “Controlled Slope Failure Blasting. International Society of Explosives Engineers, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account