Grouting Aggressive Ground in Qatar - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 16
- File Size:
- 1938 KB
- Publication Date:
- Jun 23, 2024
Abstract
Wakrah and Wukair Drainage Tunnel, WWDT
is 13 km long with a 4.5 m ID sewer water tunnel
about 50 to 60 m below ground surface. Integral
to the project are several adits with provisions for
future connections as well as four work shafts, four
intermediate access shafts, ancillary hydraulic structures,
and an Odor Control Facility. The shaft depths
range from 50 to 60 m. The project is constructed
in aggressive ground with aggressive ground water.
The construction activities require years of pumping
and disposal of the ground water during tunneling
operations as well as construction of permanent
structures in shafts. Grouting of the corrosive rock
mass in corrosive groundwater for the WWDT has
been described in detail.