Guadarrama Tunnel Construction with Double Shield TBMs

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 15
- File Size:
- 587 KB
- Publication Date:
- Jan 1, 2007
Abstract
The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented upon. Next, a detailed discussion is given of the most relevant aspects of the performance of the four double shield type TBMs. The experience of this leads to various recommendations to be borne in mind in future designs of TBM having to work in rock of similar characteristics.