Heat Leaching Practice At Alligator Ridge

The American Institute of Mining, Metallurgical, and Petroleum Engineers
T. J. DeMull
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
13
File Size:
629 KB
Publication Date:
Jan 1, 1984

Abstract

More than 1.81 mt (2 million tons) of low grade ore have been heap leached at the Alligator Ridge mine. Since inception of leaching in 1980, several modifications have been made to ore agglomeration, heap construction, and leach operation practice. These modifications have improved the percolation rate of the ore and the rate of gold extraction from the ore. Changes made in each of these areas are described and the effects of the changes are discussed.
Citation

APA: T. J. DeMull  (1984)  Heat Leaching Practice At Alligator Ridge

MLA: T. J. DeMull Heat Leaching Practice At Alligator Ridge. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account