High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft

Society for Mining, Metallurgy & Exploration
T. Eggenberg
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
3
File Size:
288 KB
Publication Date:
Jan 1, 2010

Abstract

Mechanization and automation of logistic equipment has become one of the main key factors in raising productivity and competitiveness especially for complex and larger mining or tunneling projects. The Lake Mead Intake Tunnel #3 shaft mucking installation is a good example to demonstrate the potential that is found in an overall optimized logistic. It starts with the planning and results in using customized installations which fulfill the specifically defined requirements for the project. Rowa developed a solution and supplied a shaft mucking system using a discontinuous double drum hoisting concept with shaft buckets, loading, and unloading devices. With this fully automated system a continuous muck flow of 437t/h can be achieved.
Citation

APA: T. Eggenberg  (2010)  High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft

MLA: T. Eggenberg High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft. Society for Mining, Metallurgy & Exploration, 2010.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account