High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 3
- File Size:
- 288 KB
- Publication Date:
- Jan 1, 2010
Abstract
Mechanization and automation of logistic equipment has become one of the main key factors in raising productivity and competitiveness especially for complex and larger mining or tunneling projects. The Lake Mead Intake Tunnel #3 shaft mucking installation is a good example to demonstrate the potential that is found in an overall optimized logistic. It starts with the planning and results in using customized installations which fulfill the specifically defined requirements for the project. Rowa developed a solution and supplied a shaft mucking system using a discontinuous double drum hoisting concept with shaft buckets, loading, and unloading devices. With this fully automated system a continuous muck flow of 437t/h can be achieved.
Citation
APA:
(2010) High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access ShaftMLA: High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft. Society for Mining, Metallurgy & Exploration, 2010.