High Speed Tunneling Beneath The Streets Of Manhattan

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 17
- File Size:
- 786 KB
- Publication Date:
- Jan 1, 1985
Abstract
This paper describes high speed tunneling by drilling and blasting in a heavily populated urban area. The project consists primarily of mining 2500 m (8237 ft.) of tunnel through mica schist, excavating three shafts approximately 200 m (650 ft.) each and concreting lining 5300 m (17,400 ft.) of 7.34 m (24 ft.) inside diameter tunnel. The techniques developed and equipment utilized to ensure a high rate of tunneling advance are described. Extensive planning and good communications were especially essential in maintaining production on this project since tunnel mining, tunnel concreting, and shaft excavation all proceeded simultaneously from one common work shaft and a single heading.
Citation
APA:
(1985) High Speed Tunneling Beneath The Streets Of ManhattanMLA: High Speed Tunneling Beneath The Streets Of Manhattan. Society for Mining, Metallurgy & Exploration, 1985.