Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio

Society for Mining, Metallurgy & Exploration
Richard Switalski Thomas Sisley Jozef Zurawski
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
17
File Size:
405 KB
Publication Date:
Jan 1, 1997

Abstract

Hilltop Interceptor Contract G is one of the segments of the wastewater control system in the greater Cleveland area. The tunnel is a relief interceptor constructed by the Northeast Ohio Regional Sewer District to minimize combined sewer overflows in the Easterly Service Area. The design study identified the need for a 3.35 m (132 in) diameter, 3.35 km (11,000 ft)in-line storage conveyance tunnel to be constructed at depths of 30 to 70 m (100 to 230 ft).Six structures for access, future flow drop, work shafts and overflow control were required to complete the system. The interceptor reduced the design peak flow from 12.5 m3/s(285 mgd) to 6.1 m3/s (140 mgd) by detaining in line 22,800 m3 (six million gallons) of wastewater.
Citation

APA: Richard Switalski Thomas Sisley Jozef Zurawski  (1997)  Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio

MLA: Richard Switalski Thomas Sisley Jozef Zurawski Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio. Society for Mining, Metallurgy & Exploration, 1997.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account