Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 13
- File Size:
- 2926 KB
- Publication Date:
- Jan 1, 2017
Abstract
"In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for improvement. Grinding MPC was implemented in the SAG Mill in June 2015. This pilot application, called Phase 1, featured one of the first Multivariable Predictive Controllers to be installed in a Canadian mineral processing plant. Since the implementation of MPC, gold recovery from the gravity circuit has increased. MPC contributed to a decrease in flotation feed particle size (120 to 112 µm) and an increase in the SAG feed tonnage (8.5% increase). MPC also increased and stabilized the % solids of the SAG feed, which can have an impact on cost reduction (mechanical maintenance). Additionally, MPC increased productivity, providing grinding operators with more time to perform other tasks. Further anticipated benefits include the standardization of the grinding circuit operation from one team to the next, thereby minimizing circuit disturbances resulting from different operating philosophies. This paper will discuss the advanced control project development and justification, the technology and rapid implementation process, the performance results and the benefits obtained.IntroductionGoldex is an underground mine located near Val-d’Or that is owned and operated by Agnico Eagle Mines Limited (AEM). Between 2008 and 2011, mining focused on the Goldex Extension Zone (GEZ). In 2011, the project was halted due to geotechnical problems; operations ceased until late 2013. Goldex operations resumed in September 2013 with the M and E zones, for which there were 0.7M gold ounces of proven and probable reserves, 2.1M ounces of measured and indicated resources and 1.2M ounces of inferred resources, totalizing 4M ounces. Life expectancy was extended until 2024."
Citation
APA:
(2017) Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding CircuitMLA: Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit. Canadian Institute of Mining, Metallurgy and Petroleum, 2017.