Abstract

Introduction Horizontal drilling in coal mines is a relatively new technology. The earliest recorded drilling in the United States was done in 1958 at the Humphrey mine of Consolidation Coal Co. for degasification of coal seams. Spindler and Poundstone experimented with vertical and horizontal holes for several years. They concluded in 1960 that horizontal drilling in advance of underground mining appeared to offer the most promising prospect (for degasification) but effective and extensive application would be dependent upon the ability to drill long holes, possibly 300 to 600 m, with reasonably precise directional control and within practical cost limits (Spindler and Poundstone, 1960). Mining Research Division of Conoco Inc., the parent company of Consolidation Coal Co., began a research program in the early 1970s to achieve the above objective. The technology needed to drill nearly 300 m in advance of working faces was developed by 1975 and experiments on advance degasification with such deep holes began in 1976. Preliminary results of this research have already been published (Thakur and Davis, 1977). To date nearly 4.5 km of horizontal holes have been drilled for advance degasification and earlier results were reconfirmed. In summary, these are: • The greatest impact of these boreholes was felt in the face area where methane concentrations were reduced to nearly 0.3% in course of two to three months from original values of nearly 0.95%. • The methane concentration in the section return reduced to 50% of its original value immediately after the boreholes were completed, indicating a capture ratio of 50%. • The total methane emission in the section (rib and face emission plus the borehole production) did not increase but rather gradually declined with time. • Initial production from 300 m deep boreholes in the Pittsburgh seam varied from 3 m3/min to 6 m3/min but then slowly declined as workings advanced inby of the drill site (well head) exposing a larger surface area parallel to the borehole. Encouraged by these results, it was decided to design a horizontal drilling system that would be mobile and compatible with other face equipment. A mobile horizontal drill can be divided into three subsystems: the drill rig, the drill bit guidance system, and borehole surveying instruments. The drill rig provides the thrust and torque necessary to drill 75- to 100-mm diam holes up to 600 m deep and contains the mud circulation and gas cuttings separation systems. The drill bit guidance system guides the bit up, down, left, or right as desired. Borehole surveying instruments measure the pitch, roll, and azimuth of the borehole assembly. Additionally, it also indicates the thickness of coal between the borehole and the roof or floor of the coal seam. Thus, it becomes a powerful tool for locating the presence of faults, clay veins, sand channels, and the thickness of coal seam in advance of mining. In recent years, many other potential uses of horizontal boreholes have come to light, such as in situ gasification, longwall blasting, improved auger mining, and oil and gas production from shallow deposits. The purpose of this paper is to describe the hardware and procedure for drilling deep horizontal holes. The Drilling Rig [Figures 1 and 2] show the two components of the mobile drilling rig: the drill unit and the auxiliary unit. The equipment (except for the chassis) was designed by Conoco Inc. and fabricated by J. H. Fletcher and Co. of Huntington, WV. The drill unit. It is mounted on a four-wheel drive chassis driven by two Staffa hydraulic motors with chains. The tires are 369 X 457 mm in size and provide a ground clearance of 305 mm. The prime mover is a 30-kw explosion-proof electric motor which is used only for tramming. Once the unit is Crammed to the drill site, electric power is disconnected and hydraulic power from the auxiliary unit is turned on. Four floor jacks are used to level the machine and raise the drill head to the desired level. Two 5-t telescopic hydraulic props, one on each side, anchor the drill unit to the roof. The drill unit houses the feed carriage, the drilling console, 300 m of 3-m-long NQ, drill rods, and the electric cable reel for instruments. The feed carriage is mounted more or less centrally, has a feed of 3.3 m, and can swing laterally by ± 17°. It can also sump forward by 1.2 m. The drill head has a "through" chuck such that drill pipes can be fed from the side or back end. General specifications of the feed carriage are: [ ] The auxiliary unit. The chassis for the auxiliary unit is identical to the drill unit but the prime movers are two 30-kW explosion proof electric motors. It is equipped with a methane detector- activated switch so that power will be cut off at a preset methane concentration in the air. No anchoring props are needed for this unit. The auxiliary unit houses the hydraulic power pack, the water (mud) circulating pump, control boxes for electric motors, a trailing cable spool, and a steel tank which serves for water storage and closed-loop separation of drill cuttings and gas.
Citation

APA: P. C. Thakur W. N. Poundstone  (1981)  Horizonta1 Drilling Technology for Advance Degasification

MLA: P. C. Thakur W. N. Poundstone Horizonta1 Drilling Technology for Advance Degasification. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account