How San Manuel Doubled Drift Footage

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 9
- File Size:
- 624 KB
- Publication Date:
- Jan 4, 1972
Abstract
Since the first major mine development, the company has continually looked for ways of improving drifting methods. The planned increase in production to 60,000 tpd, and the lack of trained personnel, requires new development methods to maintain this high production rate. In order to finish the drifting on the 2015 and 2075 levels, a total of 59,000 ft is required, or two years at the present rate.
Citation
APA:
(1972) How San Manuel Doubled Drift FootageMLA: How San Manuel Doubled Drift Footage. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1972.