How to Achieve 100% of Advance in Tunnel

- Organization:
- International Society of Explosives Engineers
- Pages:
- 11
- File Size:
- 2637 KB
- Publication Date:
- Jan 1, 2017
Abstract
"In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by Chavimochic Consortium. Chavimochic Special Project is an irrigation system that extends throughout much of the coast of the La Libertad Region, on the north coast of Peru. In 2012, it began management for construction of the third and last stage of CHAVIMOCHIC to irrigate lands of Chicama Valley, North of Trujillo. This project of 13 Km (8 mi) of various tunnels, it's a combination of technology and daily optimization by experienced people, which allow to accomplish the objective. Achieving this advance with no overbreak provide a huge saving on time. This paper describes the method, technology used, and the results obtained on more than 600 blasts done with conventional initiation system on the first 3 km (1.86 mi)."
Citation
APA:
(2017) How to Achieve 100% of Advance in TunnelMLA: How to Achieve 100% of Advance in Tunnel. International Society of Explosives Engineers, 2017.