Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 5
- File Size:
- 701 KB
- Publication Date:
- May 1, 2007
Abstract
The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and working times in the mine. It is estimated that the working velocity and maximum pipe length-backfill depth ratio of the backfill system are 3.82m?s-1 and 5.4, respectively and that the probable backfill capability of the system is 110.18m3?h-1. Results of hydraulic calculations for the backfill transportation system show that the designed backfill system is reliable in flowability and sufficient for backfill capability needs.
Citation
APA:
(2007) Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, ChinaMLA: Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.