Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

Canadian Institute of Mining, Metallurgy and Petroleum
Q. Zhang
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
5
File Size:
701 KB
Publication Date:
May 1, 2007

Abstract

The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and working times in the mine. It is estimated that the working velocity and maximum pipe length-backfill depth ratio of the backfill system are 3.82m?s-1 and 5.4, respectively and that the probable backfill capability of the system is 110.18m3?h-1. Results of hydraulic calculations for the backfill transportation system show that the designed backfill system is reliable in flowability and sufficient for backfill capability needs.
Citation

APA: Q. Zhang  (2007)  Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

MLA: Q. Zhang Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account