Osborne Mine commenced hydraulic filling of three stopes in April 1999. Two of these stopes experienced barricade failures in July 1999 and January 2000. As a result, a review of hydraulic filling was commissioned in April 2000. The design of a trial of revised specifications and practices is in the final stages, prior to the trial commencing in mid-2002.