Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel Modules

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 647 KB
- Publication Date:
- Jan 1, 1998
Abstract
A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that results in the maximum profit while imposing geo
Citation
APA:
(1998) Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel ModulesMLA: Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel Modules. The Australasian Institute of Mining and Metallurgy, 1998.