Improved Flotation Process Control at Newcrest's Telfer Operation

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 1823 KB
- Publication Date:
- Jan 1, 2007
Abstract
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Telfer Mine has implemented advanced process control technology to obtain stable level operation and consistent mass pull in the copper rougher and scavenger flotation circuits. The final result has been an overall reduction in variability, which impacts on both copper and gold recovery. This paper describes the methodology and implementation of the improvements in control at the Newcrest Telfer Mine as being an essential part of the business for minerals processing.
Citation
APA:
(2007) Improved Flotation Process Control at Newcrest's Telfer OperationMLA: Improved Flotation Process Control at Newcrest's Telfer Operation. The Australasian Institute of Mining and Metallurgy, 2007.