Abstract
Studena Quarry is one of the main suppliers of inert materials for concretes production in Sofia. It is characterized by massif heterogeneity in density and fissuration. Failure to take into consideration this fact during the planning of the blasting works recently had unsatisfying results in their carrying out – obtaining of materials with too small dimensions or high percentage of outsize material. Series of test blasting were carried out to find the relations for calculation of the main parameters of the drilling and blasting works. The blasting network was enlarged to 6 x 6 m, the diameter of the shot-boreholes was changed from 110 to 152 mm, the stem of the boreholes was significantly reduced and the relative consumption of blasting agents as a whole was reduced to 0,37 ?g/m3.
Citation
APA:
(2010) Improvement of the technology for performing blasting works in Studena quarryMLA: Improvement of the technology for performing blasting works in Studena quarry. International Society of Explosives Engineers, 2010.