Improvements in Truck and Shovel Scheduling Based on Capacity Constraint Modelling

The Australasian Institute of Mining and Metallurgy
P C. Hagan
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
1380 KB
Publication Date:
Jan 1, 2007

Abstract

Production scheduling is often reliant on an estimation of a mineÆs trucking capacity. While this mechanistic approach is relatively simple, it often over-estimates actual throughput resulting in under-utilisation of downstream process and a shortfall in revenue. An alternate approach has been developed that recognises the interdependency between processes in the mine production system including materials loading, haulage and crushing. This approach incorporates a heuristic model based on queuing theory that accounts for the variability in performance of individual processes and that this paper presents the results of a study comparing the conventional approach to mine scheduling with a capacity constrained model at a large open cut mine having a truck and shovel fleet. The capacity constrained model consistently predicted a lower material throughput compared to the conventional approach. Differences in throughput between the two approaches were found to increase with loading time, for example when loading time exceeded 3.9 minutes there was a shortfall of up to 40 per cent in estimated throughput. Longer travel times tended to ameliorate any differences. When applied to a mine schedule that extended over a two and a half year period, the difference was equivalent to a shortfall of nearly eight per cent in total material movement.
Citation

APA: P C. Hagan  (2007)  Improvements in Truck and Shovel Scheduling Based on Capacity Constraint Modelling

MLA: P C. Hagan Improvements in Truck and Shovel Scheduling Based on Capacity Constraint Modelling. The Australasian Institute of Mining and Metallurgy, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account