Abstract
"SJVN Limited successfully commissioned its Rampur HEP (412 MW) in 2014. The project has been planned to operate in tandem by directly utilizing the Tail Water of SJVN’s prestigious Nathpa Jhakri Hydro Power Station 1500 MW located upstream. The initial filling of voluminous water conductor system of RHEP with 10.50 m diameter, 15 Kilometer long Head Race Tunnel, involved more than 1.5 million m3 of water. The filling operation of such a large diameter tunnel constructed in young folded Himalayas which always offer less ideal sites for tunnelling and their subsequent operations under pressurized conditions is worth sharing with tunnelling fraternity. The paper covers meticulous planning, execution, precautions taken, and performance monitoring during filling process keeping in view the fragile geology, low rock cover zones, shear zones in close vicinity of thickly inhabited areas, squeezing zones, hot water zones encountered during excavation.1.0 RAMPUR HYDRO POWER STATION IN BRIEFRampur Hydroelectric Project (412 MW), is located in Himachal Pradesh (India). This project is a downstream development of Nathpa Jhakri Hydro Power Station (1500 MW) constructed on river Satluj and commissioned during 2003. Both the projects today are now successfully working in tandem. The upstream NJHPS has been constructed on the left bank of the river while the downstream Rampur HPS is located on right bank of the river (Figure-1).The major length of HRT of Rampur project lies on right bank of river before it crosses under the river in its initial reach (Figure-2). The main features of the project are as below:• 10.50 m diameter 15 km long HRT ending in a 155.75 m deep, 38.00 m diameter surge shaft.• 3 steel lined pressure shafts, 5.4 m dia, 211-220m long.• Surface valve house 69 m long x 10.50 m wide x 23 m high housing 3 No. butterfly valves• 3 No. surface penstocks 5.4m dia 368-382m long, bifurcating into six penstocks, each of 3.80 mdia. to feed six generating units of surface power house 158 m long x 24.50 m wide x 48 m high, with Francis turbines each of 68.67 MW capacity."
Citation
APA:
(2016) Initial Filling of 15 km Long, 10.50 m Diameter Voluminous Water Conductor System Constructed in Fragile Himalayan Geology - With Specific Reference to SJVN’s Rampur Hydro Electric Project (412 MW) - IndiaMLA: Initial Filling of 15 km Long, 10.50 m Diameter Voluminous Water Conductor System Constructed in Fragile Himalayan Geology - With Specific Reference to SJVN’s Rampur Hydro Electric Project (412 MW) - India. Society for Mining, Metallurgy & Exploration, 2016.