Innovative Earth Retention Project for a Parking Garage

- Organization:
- Deep Foundations Institute
- Pages:
- 12
- File Size:
- 2059 KB
- Publication Date:
- Jan 1, 2016
Abstract
"A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long building giving place for 6 parking levels and a maintenance level for busses and trucks is situated alongside a hill causing excavation height between 20 and 25 meters, which had to be secured. Due to restrictions – neighbours did not allow the client to drill anchors for retention – we designed a solution combining micropiles, strand anchors, shotcrete and nails as permanent earth retention not exceeding the space of 7 meters provided by the local street. Soil conditions were as challenging - reaching from backfill to moraine with boulders of more than 20 m³ volume – as the construction period of total 12 months for the whole project, which was opened mid of November 2015.The innovative solution outperformed the client´s project from the technical and commercial aspect and helped the contractor to save time and money.The design process with its difficulties as well as erection process is described in the following paper."
Citation
APA:
(2016) Innovative Earth Retention Project for a Parking GarageMLA: Innovative Earth Retention Project for a Parking Garage. Deep Foundations Institute, 2016.