Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

The Australasian Institute of Mining and Metallurgy
A D. Campbell
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
17
File Size:
13500 KB
Publication Date:
Mar 8, 2011

Abstract

The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a steep ten per cent unidirectional grade descending to the west. Construction of the tunnel began in the 1930s and was completed to a nominal 6 m width in 1954. In 1996, two passing bays were stripped-out to accommodate bi-directional flow of tourist coaches. During all phases of construction and widening there have been episodes of strain bursting.The condition of the tunnel and standard of internal services is below current international practice, principally in terms of; in-tunnel air quality, fire life safety, ground support, and road safety. A number of near-miss events have occurred involving coach fires on the approaches and inside the tunnel. The national road authority, NZTA, is considering a substantial investment to improve amenity and safety of the tunnel.This paper describes the rationale for the proposed upgrade works and the investigations undertaken to enable that design. A holistic approach to road tunnel safety has been adopted that balances the key interrelated safety drivers, namely; tunnel lining, traffic operations, ventilation, power supply and egress while ensuring continuity of safe access to Milford Sound.
Citation

APA: A D. Campbell  (2011)  Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand

MLA: A D. Campbell Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand. The Australasian Institute of Mining and Metallurgy, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account