Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai

Deep Foundations Institute
Sandeep S. Nikam Sanjay D. Patil Unnikrishnan Nair Prabir C. Basu
Organization:
Deep Foundations Institute
Pages:
8
File Size:
2328 KB
Publication Date:
Jan 1, 2015

Abstract

"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present transport system in MMR. The stretch of Monorail is starting from Sant Gadge Maharaj Chowk (SGMC) and extending up to Chembur Railway Station, divided into 2 phases. Construction of Phase 1 (Chembur to Wadala Depot) is complete and Phase 2 (Wadala Depot to SGMC) is under construction.Monorail runs on prestressed girder (guide beam) of span ranging from 20m to 28m supported on pier founded upon group of end bearing piles embedded in rock, pile group ranging from 2-4 piles of diameter 1000mm each.For the purpose of site characterization, geo-technical investigations were carried out along the alignment of Monorail system as mentioned above. These investigations included field and laboratory tests. The subsurface strata mainly consist of silty sand, gravel, underlain by marine clay extending up to stronger basalt rock with volcanic breccia. Overburden consisting of mainly marine clay ranging from 5.5m to 11m at all locations within the influence zone of settlement.The existing rigid pavement along of Sion-Koliwada and Anik-Wadala were constructed about 5 years prior to the construction of Monorail piers. Before laying the rigid pavement, to improve the geotechnical strength of subsoil (mainly marine clay), ground improvement using stone columns was undertaken by MMRDA. In light of limited right of way, the Monorail piers have been constructed in the median portion of the road. The line became operational on February 2014, in few months it was noticed that, in the vicinity of the Monorail piers, along Sion-Koliwada link and Anik-Wadala link, the Road Pavement Quality Concrete (PQC) panels adjacent to the Monorail piers started showing distress in form of nonuniform settlement of the concrete panels.Effect of pile foundation on pavements/PQC slab distress and possible causes of distress were investigated. Initially the distress was thought to be upheaval of monorail pier cap, but further investigations revealed the same to be soil settlement occurring over time. This paper describes the investigation carried out for identifying the cause of this settlement."
Citation

APA: Sandeep S. Nikam Sanjay D. Patil Unnikrishnan Nair Prabir C. Basu  (2015)  Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai

MLA: Sandeep S. Nikam Sanjay D. Patil Unnikrishnan Nair Prabir C. Basu Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai. Deep Foundations Institute, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account